Saturday, December 18, 2010

Build it and the meats will come

I finished the Dry-Curing room



In the front of my home's basement, is a walled section about 6 feet deep and the width of my house. On the north side is a double sink and toilet, as well as a shower head. I decided to line the other half with insulation board and wall off a 6 foot section.



On the framed out wall and door, is also a built-in wine fridge, and will be used to help cool the room in warmer months.

No comments:

Post a Comment